Land surveying — levelling, total station
T-Level: Construction — Design, Surveying and Planning: Land surveying — levelling, total station
What you'll learn
- 1
Imagine building a house on a slope — you need to know how much higher the back is than the front.
- 2
Set up the level and read the staff — the reading is 1.234 m at point A.
- 3
Let's find the height difference between two points.
- 4
Now you try — staff at point A reads 0.987 m, at point B reads 1.654 m. How much higher is B?
- 5
A total station measures both distance and angle. What does the 'total' mean?
- 6
Set up the total station to measure a 45° angle from the reference point.
- 7
If the backsight reading is 1.500 m and the foresight reading is 2.100 m, which point is higher?